Big
O Tire |
|
Bozeman,
Montana
Tire store built out of CMU block.
The building has office space, reception area, and a
large shop area. There was a lot of specialty equipment
that had to be installed including floor hoists. This
was the first of several tire stores Walker
Construct |
|
Bridger
Apartments |
|
Bozeman,
Montana
This affordable housing complex
consisted of 1 - 8 plex with offices and 3 - 12 plexes.
There are a total of 44 apartments. This was a fun and
interesting project that was completed in a little over
9 months. |
|
Conlins
Furniture |
|
Bozeman,
MT
A 40,000 sq. ft. new construction furniture
store. The building is a pre-engineered steel
building. |
|
Ferraro's
Fine Italian Restaurant |
|
Bozeman,
Montana
A 5,500 sq. ft. addition that included
a total renovation of the existing kitchen, custom wood
work, and renovating the entire existing exterior, site
and landscape. |
|
Firestone
Tire |
|
Bozeman,
Montana
Firestone Tire was built out of CMU
block. The site was originally a motel that we had to
demo and haul off. The 6,500 sq. ft. building has
specialty items such as floor joists and sealed
concrete floors. |
|
First
Community Bank |
|
Three Forks,
Montana
A beautiful 3000 sq. ft. bank that
shows Walker Construction's ability to offer a high end
commercial turnkey project. |
|
Montana
Power Company |
|
Bozeman,
Montana
Remodel of existing 55,000 sq. ft.
building and addition of 4300 sq. ft. for office space,
storage, and repair facilities. |
|
Sheriff's
Cabin |
|
Supporting the
Community!
Playhouse was built by Walker
Construction and donated to Eagle Mount to raffle for
annual fundraiser. |